ChiHomework Sign in
Berwyn, IL 60402 · 27th St

6426 27th St

Built 1925 · 2,217 sq ft
Manage Home
LOT 3,879 SQ FT · PIN 16-30-410-020-0000Lot Structure
Claiming homes opens soon on ChiHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
2,217 sqft
Lot size
3,879 sqft
Bedrooms
4
Bathrooms
2
Home type
Two-flat (2 units)
Parcel (PIN)
16-30-410-020-0000
Last sold
$425,000 · May 11, 2023

Major systems

Roof
Shingle + Asphalt
Stories
1.5
Garage
2-car garage, detached

See something wrong above? Report an error

Nearby on this street

See all 56 homes on 27th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2024
    permit on fileSolar, Rooftop Solar Install, 15 Modules, 5Kw/Ac. Must Have Tap Connectors.----All Solar Panels Installed On The House Or Garage Must Follow The Fire-Man Code 3 Ft From Each Side Of The Roof 3 Ft From The Top Of The Roof 18 Inches From The Bottom Of
  • 2023
    permit on fileKitchen, Paying For Electrical Final And Electrical Service Inspection Fees.------------In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirculating Vent And Bathrooms. Boilers To Forced Air With New Furnace Ductwork A/S Units. P
  • 2023
    permit on fileKitchen, Plumbing Final Re-Inspections And Preliminary Electrical Inspection To Discuss What Needs To Be Done In Regards To The Electrical Service--------------------------------In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirc
  • 2023
    permit on fileKitchen, Paying For Electrical Final Re-Inspections For Both Units And Re-Inspections Of Of Added Additional Inspections ---- In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirculating Vent And Bathrooms. Boilers To Forced Air Wi
  • 2023
    permit on fileKitchen, Paying For Electrical Service Re-Inspection ---- In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirculating Vent And Bathrooms. Boilers To Forced Air With New Furnace Ductwork A/S Units. Patch Prime And Paint The House
  • 2022
    permit on fileKitchen, Reomove Kitchen Cabinets-Drywall-Wall Wall In The Kitchen Re,Ove Ceramic Tile On The Bathroom Remove Allwalls And Drywall In The Basementdemo To Studs
  • 2022
    permit on fileKitchen, In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirculating Vent And Bathrooms. Boilers To Forced Air With New Furnace Ductwork A/S Units. Patch Prime And Paint The House And Garage. R/R 2 Water Heaters. Bring Electrica
  • 2022
    permit on fileKitchen, Plumbign Rough Re-Inspection For 1St Floor And Second Floor------In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirculating Vent And Bathrooms. Boilers To Forced Air With New Furnace Ductwork A/S Units. Patch Prime And
  • 2022
    permit on fileKitchen, Plumbign Rough Re-Inspection For 1St Floor And Second Floor------In The 1Stfloor 2Nd Floor Units Remodel The Kitchen To Include Mocrowave With Recirculating Vent And Bathrooms. Boilers To Forced Air With New Furnace Ductwork A/S Units. Patch Prime And

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet
Water heaterUnknown
Not found in our records yet
ElectricalUnknown
Not found in our records yet
KitchenOn record
Permit on file · 2023
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet, not that it hasn't happened. Own this home? Claim it to fill in what we're missing.