ChiHomework Sign in
Berwyn, IL 60402 · Grove Ave

3101 Grove Ave

Built 1892 · 1,712 sq ft
Manage Home
LOT 3,031 SQ FT · PIN 16-31-107-001-0000Lot Structure
Claiming homes opens soon on ChiHomework.
Claim it to correct details and keep its record yours.

We'll email you a one-time sign-in link.

What's on record

Year built
1892
Living area
1,712 sqft
Lot size
3,031 sqft
Bedrooms
3
Bathrooms
3
Home type
Two-flat (2 units)
Parcel (PIN)
16-31-107-001-0000
Last sold
$225,000 · Jan 18, 2022

Major systems

Roof
Shingle + Asphalt
Stories
2
Garage
2-car garage, detached

See something wrong above? Report an error

Nearby on this street

See all 759 homes on Grove Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2024
    permit on fileRoof, Tear Off And Reshingle The House To Code.
  • 2023
    permit on fileGeneral remodel, R/R Seven Windows. 1St Flopor Living Room 3, 2Nd Floor Living Room 3, 1St Floor Foyer 1.
  • 2023
    permit on fileGeneral remodel, Spot Tuckpoint The Building Where Needed, R/R 20-50 Bricks Where Needed And R/R The Chimney Crown.
  • 2022
    permit on fileElectrical, Upgrade Service From 100Amp To 200Amp, Adding 3Rd Meter For Common Areas, Install 3 New Panels 1St, 2Nd Fl And Common Area
  • 2022
    permit on fileElectrical, Install Emergency Lights W/ Battery Back Up In Front And Rear Stairwells. Install Switch Activated Hardwaired Light Fixture On 1St Floor Bedrooms 1 2 Replace Missing Electrical Cover Outlets. Install Egress Windows In Basement. Preliminary Structural
  • 2022
    permit on fileElectrical, Paying For Electrical Final And Electrical Service Re-Inspection --------- Upgrade Service From 100Amp To 200Amp, Adding 3Rd Meter For Common Areas, Install 3 New Panels 1St, 2Nd Fl And Common Area
  • 2022
    permit on fileElectrical, Paying For Electrical Rough Re-Inspection ----- Install Emergency Lights W/ Battery Back Up In Front And Rear Stairwells. Install Switch Activated Hardwaired Light Fixture On 1St Floor Bedrooms 1 2 Replace Missing Electrical Cover Outlets. Install Eg
  • 2022
    permit on fileElectrical, Paying For Electrical Final And Electrical Service Re-Inspection --------- Upgrade Service From 100Amp To 200Amp, Adding 3Rd Meter For Common Areas, Install 3 New Panels 1St, 2Nd Fl And Common Area
  • 2022
    permit on fileElectrical, Paying For Electrical Final And Electrical Service Re-Inspection --------- Upgrade Service From 100Amp To 200Amp, Adding 3Rd Meter For Common Areas, Install 3 New Panels 1St, 2Nd Fl And Common Area

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofOn record
Permit on file · 2024
Water heaterUnknown
Not found in our records yet
ElectricalOn record
Permit on file · 2022
KitchenUnknown
Not found in our records yet
BathroomsUnknown
Not found in our records yet

“Unknown” means we haven't matched a record for it yet, not that it hasn't happened. Own this home? Claim it to fill in what we're missing.